AbstractTo ensure the safe construction of prefabricated buildings and improve the efficiency of the safe evacuation of construction personnel after a fire caused by improper operation during construction, this study used the PyroSim software to numerically simulate a fire situation based on the size and volume of a prefabricated building construction site. The variation rules of smoke visibility, CO concentration, and ambient temperature in the construction site of prefabricated buildings were analyzed and the available safe evacuation time was determined. Moreover, the Pathfinder software was used for simulation in combination with the physical attributes of personnel, evacuation speed, and personnel proportions. The time required for safe evacuation was determined and the factors influencing the evacuation time, such as the quantity and location of stacked prefabricated components, machinery, and appliances, and the number of on-site construction personnel, were analyzed. The data collected by the temperature sensor, CO concentration sensor, and visibility sensor reveal that the visibility and crash time are the key factors restricting the efficiency of personnel avoidance and evacuation. At 400 s, the visibility at the escape exit of the prefabricated apartment construction site was lower than 5 m. The crashing time of the building was 360 s, which is the critical point for casualties. The first emergency evacuation simulation took 398.7 s. The required safe evacuation time (TREST) > available safe evacuation time (TASET), and the original site layout cannot facilitate the safe evacuation of all construction workers. The evacuation time can be effectively reduced by re-planning the stacking positions of prefabricated construction site components, construction equipment, and other items, and reducing the number of personnel in the construction plane. The results of the second simulation reveal that the safe evacuation time (TREST) is 355.2 s. Because it is required that the safety evacuation time (TREST) < available safe evacuation time (TASET), the results are in line with the emergency evacuation requirements. The findings of this study can provide a theoretical basis for the rational planning of evacuation passages at the construction sites of prefabricated buildings and assist the management of construction site safety.
Funder
The Youth Project of Liao ning Provincial Education Department
The National Key R&D Program of China
Publisher
Springer Science and Business Media LLC
Reference28 articles.
1. Junmei, W. Research on Safety Evacuation of Labor Workers in Construction Site Based on BIM (Xi’an University of Architecture and Technology, 2015).
2. Zhishuai, W., Quanjie, Z. & Zhen, Zh. Research on fire simulation and emergency evacuation simulation of a university office building. J. N. China Univ. Sci. Technol. 18(2), 109–118 (2020).
3. Sujatmiko, W. et al. Performance-based fire safety evacuation in high-rise building flats in Indonesia—A case study in Bandung. Proc. Environ. Sci. 20, 116–125 (2014).
4. Lovreglio, R., Ronchi, E. & Borri, D. The validation of evacuation simulation models through the analysis of behavioural uncertainty. Reliab. Eng. Syst. Saf. 131(3), 166–174 (2014).
5. Helbing, D., Farkas, I. J. & Vicsek, T. Simulating dynamical features of escape panic. Soc. Sci. Electron. Publ. 407(6803), 487–490 (2000).
Cited by
19 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献