Abstract
PurposeHigh-level labor waste is a major challenge in construction projects. This paper aims to identify, quantify and categorize labor waste in the context of Iranian housing construction projects.Design/methodology/approachThis research uses a case study approach, with empirical data collected through direct observations and semi-structured interviews.FindingsHaving triangulated the findings from the literature review and empirical studies, a list of eight types of waste was derived for the thirteen observed laborers in ten case study projects. The empirical studies allowed the labor waste identified from the literature to be verified and refined by considering it in the context of the observed activities, and led to two new types of waste being identified which were not considered in the literature. Findings indicate that nearly 62% of laborers' time is spent on non-value-adding activities. It appeared that “unnecessary movement,” “waiting” and “indirect work” make up the highest labor waste.Research limitations/implicationsThis research focuses only on onsite resource flows in a housing construction site. It does not include offsite flows such as material delivery to site.Originality/valueThe findings have provided substantial evidence on type and amount of labor waste and provide a solid basis to stimulate construction actors to participate in reducing labor waste and improving productivity.
Subject
Management, Monitoring, Policy and Law,Urban Studies,Building and Construction,Renewable Energy, Sustainability and the Environment,Civil and Structural Engineering,Human Factors and Ergonomics
Reference87 articles.
1. A preliminary proposal for a waste-based management approach to improve performance in construction,2013
2. An application of lean concepts and simulation for drainage operations maintenance crews,2003
3. System dynamics modeling approach to quantify change orders impact on labor productivity 1: principles and model development comparative study;International Journal of Construction Management,2020
4. Factors affecting construction labour productivity in Yemen;International Journal of Construction Management,2019
5. Assessing the degree of industrialisation in construction–a case of Uganda;Journal of Civil Engineering Management,2006
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献