1 A multi-objective optimization for green supply chain network design
来源:DECIS SUPPORT SYST( P 0167-9236 E 1873-5797 ) 发表时间: 2011/05
类型:期刊论文 为本人加分:30955.568233
2 A new proof-of-work mechanism for bitcoin
来源:FINANC INNOV( P E 2199-4730 ) 发表时间: 2016/12
类型:期刊论文 为本人加分:4512.095746
3 K Constrained Shortest Path Problem
来源:IEEE T AUTOM SCI ENG( P 1545-5955 E 1558-3783 ) 发表时间: 2010/01
类型:期刊论文 为本人加分:4016.430033
4 Contracting with an urgent supplier under cost information asymmetry
来源:EUR J OPER RES( P 0377-2217 E 1872-6860 ) 发表时间: 2010/10
类型:期刊论文 为本人加分:4002.359895
5 Group-to-group reviewer assignment problem
来源:COMPUT OPER RES( P 0305-0548 E 1873-765X ) 发表时间: 2013/05
类型:期刊论文 为本人加分:1722.515363
6 The multi-criteria constrained shortest path problem
来源:TRANSPORT RES E-LOG( P 1366-5545 E ) 发表时间: 2017/05
类型:期刊论文 为本人加分:1385.718120
7 The dynamic fleet management problem with uncertain demand and customer chosen service level
来源:INT J PROD ECON( P 0925-5273 E 1873-7579 ) 发表时间: 2014/02
类型:期刊论文 为本人加分:1378.667396
8 Horizontal cooperation and information sharing between suppliers in the manufacturer-supplier triad
来源:INT J PROD RES( P 0020-7543 E 1366-588X ) 发表时间: 2014/01
类型:期刊论文 为本人加分:1263.091125
9 a comprehensive survey of the reviewer assignment problem
来源:INT J INF TECH DECIS( P 0219-6220 E 1793-6845 ) 发表时间: 2010/07
类型:期刊论文 为本人加分:583.066158
10 An adaptive routing strategy for freight transportation networks
来源:J OPER RES SOC( P 0160-5682 E 1476-9360 ) 发表时间: 2011/04
类型:期刊论文 为本人加分:292.660908