Abstract
<p style='text-indent:20px;'>In this research, a parallel machine sequence-dependent group scheduling problem with the goal of minimizing total weighted earliness and tardiness is investigated. First, a mathematical model is developed for the research problem which can be used for solving small-sized instances. Since the problem is shown to be NP-hard, this research focuses on proposing meta-heuristic algorithms for finding near-optimal solutions. In this regard, the main contribution of this research is to apply the Biogeography-based Optimization (BBO) algorithm as a novel meta-heuristic and Variable Neighborhood Search (VNS) algorithm as a best-known one. In order to evaluate the mathematical model and solution methods, several computational experiments are conducted. The computational experiments demonstrate the efficiency of the proposed meta-heuristic algorithms in terms of speed and solution quality. The maximum gap of BBO algorithm is 1.04% and for VNS algorithm, it is 1.35%.</p>
Publisher
American Institute of Mathematical Sciences (AIMS)
Subject
Applied Mathematics,Control and Optimization,Strategy and Management,Business and International Management,Applied Mathematics,Control and Optimization,Strategy and Management,Business and International Management
Cited by
49 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献