Abstract
Abstract
Mechanical, electrical, and plumbing (MEP) system experts often have difficulties in converting their designs, in computer-aided design (CAD), into building information models (BIMs) owing to excessive repetitive work, lack of BIM skilled workers, frequent BIM recreations, etc. Therefore, this study aimed to formalize the CAD-to-BIM process of MEP systems, focusing on sanitary plumbing system, including soil, drain system, hot water supply, and cold water supply system. Each system’s process is composed of a combination of the following five common modules: pipeline processing module, pipe connection module, initial level setting module, addition riser nipple module, and clash resolution module. Consequently, a prototype developed based on the formalized process produced a sanitary plumbing BIM model that is identical to the CAD drawings and has no clashes. This study contributes to the MEP BIM theory by identifying considerations for CAD-to-BIM conversion of sanitary plumbing system and formalizing the process reflecting them.
Funder
Korea Agency for Infrastructure Technology Advancement
Ministry of Land, Infrastructure and Transport
Publisher
Oxford University Press (OUP)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献