Author:
Wang Yanqin,Ning Xu,Zhen Dong,Yong Wang,Zhang Hongshan
Abstract
At present, the conventional construction project cost prediction method mainly constructs the cost prediction model by quantifying the engineering information, which leads to poor prediction effect due to the lack of construction of cost prediction index system. In this regard, the research of construction cost prediction model based on recurrent neural network is proposed. By classifying and integrating the construction project cost concepts, constructing the prediction index system, combining with the recurrent neural network algorithm, constructing the excitation function and calculating the initialization threshold, and finally constructing the prediction model. In the experiment, the proposed method is verified for the prediction accuracy. After the experiments, it can be proved that when the proposed model is used to predict the engineering cost, the root mean square error of the model output is small and has a more ideal prediction accuracy.
Reference15 articles.
1. Analysis of work accident cost on occupational safety and health risk handling at construction project of Hasanuddin University the Faculty of Engineering
2. Ding X., Lu Q. Construction cost management strategy based on BIM technology and neural network model[J]. Journal of Intelligent and Fuzzy Systems, 2020(6):1–13.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献