Affiliation:
1. The 5th Construction Company LTD
2. Shenyang University of Technology
Abstract
Houdingxiang No. 3 Bridge is a 4-span steel box girder bridge. After the incremental launching construction, the bridge has to be lowering to the support bear, the lowering construction is divided into three stages. At first the launching equipment is used to lower 80cm, the next the jack with load capacity of 180 tons is used to lower 110cm, finally three-direction-jack with load capacity of 200 tons is used to lower 20cm. mechanical analysis on lowering the bridge used jacks with the load capacity of 180 tons and 200 tons is respectively carried out by FEM software ABAQUS, and the result shows that this kind of lowering technique is safe and reliable, it meets the construction demand.
Publisher
Trans Tech Publications, Ltd.
Reference5 articles.
1. MJ. Pennock and YY. Haimes: Systems engineering Vol. 5 (2002), p.56.
2. Juan A Sobrino: Civil Engineering Vol. 4 (2008), p.6.
3. Graciano Carlos: Journal of Structural Engineering Vol. 2 (2005), p.268.
4. Michel Yirlogeux, Claude Servant, Jean-Marie, et al: Structural Engineering International Vol. 1 (2005), p.4.
5. Wu Hongsheng, et al: Proceedings of the International Conference on Logistics, Engineering, Management and Computer Science, Shenyang: China (2014) , p.446.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献