Antecedents of variations in construction contracts - A statistical correlational study

Author:

Ravinder B.1

Affiliation:

1. NICMAR Institute of Construction Management and Research (NICMAR)

Abstract

Modifications to the design, quality, quantity of work, and standard of materials or goods to be utilized and the removal of any materials not in compliance with the contract from the site, are all considered variations in construction. The building industry is facing a significant problem with variation orders. This led to delays, cost overruns, and occasional disputes between the parties over contracts. This paper sought to determine the underlying reasons for variation, the implications of variations on Indian projects, and strategies for lessening the impact of variation orders. The study's methodology included a review of the literature, the collection of primary data, interviews, and closed-ended questionnaires. To determine whether there was a significant difference in the means of the professional groups, the analysis of variance test is employed. The collected data is reliable, the Cronbach alpha is greater than 0.70, and also the Pearson correlation coefficient is lying between -1 and 1. From this study, it is concluded that the correlation may or may not exist among the antecedents of variations, and their correlation may appear in any direction, and it is also in line with standard theory of statistics.

Publisher

i-manager Publications

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3