Abstract
AbstractReasonable production capacity is related to the economic benefits of an open-pit coal mine. This study analyzes the relationship between the working face length, the annual advancing speed and the production capacity. It constructs a production capacity function relationship model. Take the Baorixile open-pit coal mine as an example. The remaining unmined parts are divided into four regions, and the range of production capacity in each region is analyzed by the established model and the determined respectively. On this basis, three mining district division plans are proposed. By analyzing and comparing the stripping ratio, mining life of the district, fault influence, difficulty of transition connection in the mining districts, the convenience of transportation system layout and other indexes of each plan, Plan 3 is determined to be the optimal plan. The production capacity planning results of each mining district in this plan are as follows: the production capacity of the 3rd mining district is 30–35 Mt/a; the production capacity of the 4th mining district in Region 1 is 20–31 Mt/a, and the production capacity in Region 2 is 24–33 Mt/a; the production capacity of the 5th mining district is 20–27 Mt/a.
Funder
National Natural Science Foundation of China
Jie Bang Gua Shuai' (Take the Lead) of the Key Scientific and Technological Project for Liaoning Province
Discipline Innovation Team of Liaoning Technical University
National Science Fund for Distinguished Young Scholars
School level scientific research project of Yancheng Institute of Technology
Publisher
Springer Science and Business Media LLC
Reference33 articles.
1. Xie, H. P., Wu, L. X. & Zheng, D. Z. Prediction on the energy consumption and coal demand of China in 2025. J. China Coal Soc. 44(7), 1949–1960 (2019).
2. Li, X., Cao, Z. & Xu, Y. Characteristics and trends of coal mine safety development. Energy Sources Part A Recov. Util. Environ. Effects. 1–19 https://doi.org/10.1080/15567036.2020.1852339 (2020).
3. Adibi, N., Ataee-pour, M. & Rahmanpour, M. Integration of sustainable development concepts in open pit mine design. J. Clean. Prod. 108, 1037–1049 (2015).
4. Meagher, C., Dimitrakopoulos, R. & Avis, D. Optimized open pit mine design, pushbacks and the gap problem—a review. J. Min. Sci. 50(3), 508–526 (2014).
5. Groeneveld, B. & Topal, E. Flexible open-pit mine design under uncertainty. J. Min. Sci. 47(2), 212–226 (2011).
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献