Author:
Wang Kang,Li Yikai,Wang Xiaojun,Zhao Zengtao,Yang Ning,Yu Shengcan,Wang Yi,Huang Zhanhong,Yu Tao
Abstract
Under high-penetration of renewable energy, power grid is facing with the development problems such as production delay, wind and solar power abandoning. With the continuous growth of renewable energy installation such as wind power, photovoltaic (PV), as well as the increase of power generation capacity, it is urgent to increase peak-load and frequency regulation capacity on a large scale to alleviate the consumption problems caused by large renewable energy integration, and then requires power generation enterprises of peak-load and frequency regulation to increase relevant equipment assets. As a result, peak-load and frequency regulation enterprises must carry out scientific cost management of equipment assets. This paper introduces the concepts, developments and perspectives of life cycle cost (LCC) management of equipment assets in high-penetrated renewable energy power grid, and probes into cost collection and estimation scheme in the process of equipment asset management.
Subject
Economics and Econometrics,Energy Engineering and Power Technology,Fuel Technology,Renewable Energy, Sustainability and the Environment
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献