Abstract
Apartment housing occupies the highest proportion of the domestic construction market and significantly influences the flow of the real estate market. Frequent design changes and reconstruction in new apartment housing projects lead to an increase in construction cost and schedule, and a decline in design and construction quality, which is an important issue affecting the quality of use for occupants. The causal relationship of design changes and error in new apartment building projects has not been previously identified. Accordingly, design changes management activities in the construction phase using reactive manner are a critical risk that causes the productivity of the project to deteriorate. In this study, a complex and non-linear causal relationship between the design change factors was investigated using the association rule mining technique (ARM), a type of data mining technique. In particular, the associated relationship between design change factors that can be changed according to conditions that significantly affect the productivity and performance of projects, such as a contractor’s ranking in the field, contract price which means the project size, and contractor selection methods, was identified. The association rule between the design changes at the construction phase derived in this research can be used as a guide to identify and minimize the risk of design changes in advance.
Funder
The National Research Foundation of Korea
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Reference28 articles.
1. Cheng, R., and Johnson, A. Motivation and Means: How and Why IPD and Lean Lead to Success, 2016.
2. Analysis of Causes and Impact of Change Orders in the U.S. Military Construction Projects;Park;J. Korea Inst. Build. Constr.,2021
3. Lean Management Model for Construction of High-Rise Apartment Buildings;Sacks;J. Constr. Eng. Manag.,2007
4. Analysis of factors affecting design changes in construction project with Partial Least Square (PLS);Yana;Procedia Eng.,2015
5. The Pathology of Building Defects; A Human Error Approach;Atkinson;Eng. Constr. Archit. Manag.,2002
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献