Analysis of Design Change Mechanism in Apartment Housing Projects Using Association Rule Mining (ARM) Model

Author:

Kim Moonhwan,Lee JoosungORCID,Kim Jaejun

Abstract

Apartment housing occupies the highest proportion of the domestic construction market and significantly influences the flow of the real estate market. Frequent design changes and reconstruction in new apartment housing projects lead to an increase in construction cost and schedule, and a decline in design and construction quality, which is an important issue affecting the quality of use for occupants. The causal relationship of design changes and error in new apartment building projects has not been previously identified. Accordingly, design changes management activities in the construction phase using reactive manner are a critical risk that causes the productivity of the project to deteriorate. In this study, a complex and non-linear causal relationship between the design change factors was investigated using the association rule mining technique (ARM), a type of data mining technique. In particular, the associated relationship between design change factors that can be changed according to conditions that significantly affect the productivity and performance of projects, such as a contractor’s ranking in the field, contract price which means the project size, and contractor selection methods, was identified. The association rule between the design changes at the construction phase derived in this research can be used as a guide to identify and minimize the risk of design changes in advance.

Funder

The National Research Foundation of Korea

Publisher

MDPI AG

Subject

Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science

Reference28 articles.

1. Cheng, R., and Johnson, A. Motivation and Means: How and Why IPD and Lean Lead to Success, 2016.

2. Analysis of Causes and Impact of Change Orders in the U.S. Military Construction Projects;Park;J. Korea Inst. Build. Constr.,2021

3. Lean Management Model for Construction of High-Rise Apartment Buildings;Sacks;J. Constr. Eng. Manag.,2007

4. Analysis of factors affecting design changes in construction project with Partial Least Square (PLS);Yana;Procedia Eng.,2015

5. The Pathology of Building Defects; A Human Error Approach;Atkinson;Eng. Constr. Archit. Manag.,2002

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3