Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak Stratum

Author:

Lv Jianbing1ORCID,Lu Jianjun1,Huang Jingkai1,Huang Juan1ORCID,Li Jia1,Ge Xiangyang1

Affiliation:

1. School of Civil and Transportation Engineering, Guangdong University of Technology, Guangzhou 510006, China

Abstract

The underground hole pile excavation method causes a large vertical displacement in a weak stratum, which affects the safety of structures. For the first time, the hole pile excavation method is being used to construct a subway station in South China, and the settlement law of the area is not clear. It is important to clarify the deformation law of the hole pile excavation method in weak strata and the effect achieved by appropriate reinforcement measures. In this paper, by establishing a three-dimensional finite element model of the structure–soil contact element and combining it with the field monitoring data, the law of surface settlement caused by the hole pile excavation method with different thicknesses of the weak stratum has been studied. In order to improve the stability of the surrounding rock and reduce the vertical deformation of the surface, the Metro Jet System (MJS) is used to form inclined piles in the area of large surface deformation, and the effect after reinforcement was evaluated. The results show that as the weak layer thickness ratio increases, the surface settlement also increases. In the case of no reinforcement, a vertical settlement of 116 mm can be achieved when the thickness of the weak layer is 14 m. The vault of the tunnel is in the weak layer and the deformation is obvious. When the vault is not in the weak layer, the settlement is obviously reduced. After MJS pile reinforcement, under the action of soil extrusion, the self-stability of the surrounding rock is strengthened, and the oblique jet grouted pile forms a stable ‘triangle’. The vertical settlement value is basically stable at around 30 mm, which meets the requirements of the regulations. If the tunnel is not reinforced, the self-stability of the surrounding rock above the tunnel arch is poor and the maximum settlement is at the surface. After MJS reinforcement, the maximum settlement is at the vault. The vertical settlement of the ground surface can be effectively controlled by using the MJS pile forming technology in the middle of the tunnel pile driving method.

Funder

Foundation of Outstanding Youth of Guangdong Province

Publisher

MDPI AG

Subject

Building and Construction,Civil and Structural Engineering,Architecture

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3