Exploring Briefing Processes across Mature Markets of Public–Private Partnership (PPP) Projects: Comparative Insights and Important Considerations

Author:

Al Saadi Rauda1,Abdou Alaa2ORCID

Affiliation:

1. Department of Architectural Engineering, United Arab Emirates University, Al Ain 15551, United Arab Emirates

2. Healthy and Sustainable Buildings Research Center, Department of Architecture, Ajman University, Ajman 346, United Arab Emirates

Abstract

The primary objective of this research paper is to conduct a comprehensive investigation into the process of developing briefs for Public–Private Partnership (PPP) projects. The study aims to outline the fundamental stages, standard processes, and critical decision points involved in this process. This is achieved through a comparative analysis of briefing frameworks used in three countries that are among the top in the PPP Market Maturity chart: The United Kingdom, Australia, and Canada. The paper discusses the stages and decision points within these countries’ briefing processes, highlighting their challenges, similarities, and differences. It emphasizes the fundamental role of effective communication and coordination in PPP projects, which involve multiple stakeholders. By examining these interconnected activities and analyzing the phases, stages, and key processes constituting the briefing process, the study provides valuable insights into the PPP briefing processes in these nations. The paper concludes by proposing a conceptual process framework for brief development in PPP projects, which will be further tailored for adaptation in the PPP market in the United Arab Emirates.

Publisher

MDPI AG

Reference49 articles.

1. Improving the Client Briefing for UAE Public Healthcare Projects: Space Programming Guidelines;Abdou;Archit. Eng. Des. Manag.,2011

2. Smith, J., and Wyatt, R. (2006, January 3–5). Project inception: A performance brief approach. Proceedings of the CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, Beijing, China.

3. Impact of project briefing clarity on construction project performance;Vahabi;Int. J. Constr. Manag.,2020

4. Othman, A.A.E. (2010). Value and Risk Management for Dynamic Brief Development in Construction: Value and Risk Management in Construction, LAP Lambert Academic Publishing.

5. Client briefing processes and procurement method selection: A South African study;Bowen;Eng. Constr. Archit. Manag.,1999

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3