Analysis of the Transfer Time and Influencing Factors of Air-Rail Integration Passengers: A Case Study of Shijiazhuang Zhengding International Airport

Author:

Jiang Fan,Wang Lichao,Huang ShiyuORCID

Abstract

As China’s high-speed rail and civil aviation gradually move from a competitive relationship to a cooperative relationship, air-rail integration services (ARISs) have begun to be promoted, and an increasing number of passengers are choosing the combined travel mode of high-speed rail and aviation. As two long-distance transportation modes are involved, transfer time also affects transfer service satisfaction, and the factors affecting the transfer time of ARIS need to be further clarified. In this study, a stated preference (SP) survey on the transfer reservation time of ARIS passengers was conducted, the perception accuracy of the transfer reservation time was analyzed, and the influencing factors of the transfer reservation time in each link were analyzed by using a multivariate ordered logistic regression model. The results show that the average transfer time of air-rail combined transportation passengers is 102 to 128 min; more than half of passengers’ reservation time is reasonable; and passengers’ genders, educations, occupations, incomes, travel modes, costs, and distances have different degrees of impact on the transfer reservation time. This study holds a certain guiding significance for improving the service quality of air-rail intermodal transportation and improving transfer efficiency and provides a theoretical basis for personalized and customized services for air-rail intermodal passengers.

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction

Reference32 articles.

1. The integration of rail and air transport in Britain;Stubbs;J. Transp. Geogr.,1998

2. Bory, M.P. (2022, June 12). Air-Rail Intermodality: Optimizing Airport Capacity. Available online: http://www.ejrcf.or.jp/jrtr/jrtr19/pdf/F28_Bory.pdf.

3. (2022, November 22). Shijiazhuang Airport Air-Rail Integration Transport Accounts for 60% of Beijing, and It Is Difficult to Resist the Temptation of the Economic Circle. Available online: http://news.carnoc.com/list/256/256865.html.

4. (2022, November 22). Shijiazhuang Airport Dilemma: Reimbursement of Train Tickets by Air Has been Subsidized by 2 Million Yuan to Attract More Passengers. Available online: https://www.guancha.cn/economy/2013_08_23_167669.shtml.

5. How could the collaboration between airport and high speed rail affect the market?;Takebayashi;Transp. Res. Part A Policy Pract.,2016

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3