Abstract
Electrical risk has a particular impact within the construction sector. This leads to the development of regulations to mitigate it, but correct application of regulations is impossible with a traditional 2D analysis. The construction sector is using technologies from the industrial sector (Construction 4.0), with BIM as the main enabling technology. Thus, the objective of this article is the evaluation of the risk produced by Overhead Power Lines (OPL) through BIM integration. The OPL, its risk zones, the affected road, and the envelope resulting from the geometry of the necessary machines to build it were digitized, converging in a single model to perform a 4D risk analysis. The risks of the execution of the embankment and road surface of a road section passing through an OPL were analyzed by means of the collision of the envelope with its risk zones, resulting in an integration of their evaluation, to which was added the introduction of preventive measures and their re-evaluation. The parametric 3D modelling allowed a better definition of the risk zones and the BIM management minimized errors, providing traceability of decisions from the design phase, complying with health and safety regulations and applying the principle of Prevention through Design (PtD).
Subject
Health, Toxicology and Mutagenesis,Public Health, Environmental and Occupational Health
Reference75 articles.
1. Census of Fatal Occupational Injuries (CFOI)—Current and Revised Data
2. Role of Visualization Technologies in Safety Planning and Management at Construction Jobsites
3. L’importance Des Coûts Sociaux Liés à Une Absence de Prise En Compte Ou à Une Mauvaise Organisation Des Conditions de Travail et de Sécurité;Lorent,1989
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献