1. Al-Zaid R. (1989). “Fatigue reliability of prestressed concrete girder bridges ” PhD thesis Univ. of Michigan Ann Arbor Mich.
2. Bökamp H. (1990). “Ein Beitrag zur Spannstahlermüdung unter Reibdauerbeanspruchung bei teilweiser Vorspannung ” PhD thesis Technischen Hochschule Aachen Aachen Germany (in German).
3. Fatigue Reliability Reassessment Procedures: State-of-the-Art Paper
4. Casas J. R. and Crespo-Minguillón C. (1996). “Serviceability and fatigue evaluation of existing bridges.” Proc. U.S.Europe Workshop on Bridge Engrg. J. R. Casas F. W. Klaiber and A. R. Mari eds. 441–464.