Developing an Integrative Data Intelligence Model for Construction Cost Estimation

Author:

Ali Zainab Hasan1ORCID,Burhan Abbas M.1ORCID,Kassim Murizah23ORCID,Al-Khafaji Zainab4ORCID

Affiliation:

1. Civil Engineering Department, College of Engineering, University of Baghdad, Baghdad, Iraq

2. Institute for Big Data Analytics and Artificial Intelligence (IBDAAI), Universiti Teknologi MARA, Shah Alam 40450, Selangor, Malaysia

3. School of Electrical Engineering, College of Engineering, Universiti Teknologi MARA, Shah Alam 40450, Selangor, Malaysia

4. Building and Construction Techniques Engineering Department, Al-Mustaqbal University College, Babylon 51001, Iraq

Abstract

Construction cost estimation is one of the essential processes in construction management. Project cost is a complex engineering problem due to various factors affecting the construction industry. Accurate cost estimation is important in construction management and significantly impacts project performance. Artificial intelligence (AI) models have been effectively implemented in construction management studies in recent years owing to their capability to deal with complex problems. In this research, extreme gradient boosting is developed as an advanced input selector algorithm and coupled with three AI models, including random forest (RF), artificial neural network (ANN), and support vector machine (SVM) for cost estimation. Datasets were gathered based on a survey conducted on 90 building projects in Iraq. Statistical indicators and graphical methods were used to evaluate the developed models. Several input predictors were used, and XGBoost highlighted inflation as the most crucial parameter. The results indicated that the best prediction was attained by XGBoost-RF using six input parameters, with r-squared and the mean absolute percentage error equal to 0.87 and 0.25, respectively. The comparison results revealed that all AI models showed good prediction performance when applied to datasets affected by more than two parameters. The outcomes of this research revealed an optimistic strategy that can help decision makers select the influencing parameters in the early phases of project management. Also, developing a prediction model with high precision results can assist the project’s estimators in decreasing the errors in the cost estimation process.

Funder

Universiti Teknologi MARA

Publisher

Hindawi Limited

Subject

Multidisciplinary,General Computer Science

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3