Causes of Variation Orders in Road Construction Projects in Tanzania

Author:

Saki Roziana,Yeom Chunho

Abstract

Background: Variation order has long been an essential component of road construction projects worldwide, being predominantly observed in Tanzania, where road projects are particularly vulnerable. Objective: This study aimed to determine the sources of variation orders in Tanzanian road construction projects and provide a feasible remedy, such as reduction or eradication. Methods: A desk study and questionnaire were utilized as the research approach and analyzed using the relative importance index (RII) method. Results and Discussion: The results reveal that the most significant circumstances causing variation orders are financial problems, weather conditions, differing site conditions, changes in design, poor scheduling, lack of coordination, delay in approval, unavailability of equipment, and lack of communication. Conclusion: Recommended strategies to minimize variation orders were that all involved parties should plan before the commencement of on-site work and perform detailed site investigations. Consultants should ensure that the design and specifications are within the approved budget. All participants were required to spend adequate time in the pretender planning phase. Finally, accurate information and research should be obtained regarding procurement procedures, materials, and plants.

Publisher

Bentham Science Publishers Ltd.

Subject

Transportation,Modeling and Simulation

Reference15 articles.

1. Ibbs CW, Wong CK, Kwak YH. Project change management system. J Manage Eng 2001; 17 (3) : 159-65.

2. Matimbe HS, Lema NM. Evaluation of cost and time performance of integrated roads projects (IRP) in Tanzania Proceedings of Annual Roads Convention on Road Transport: Key to Development 1997; Dar es Salaam. 1997; pp. 332-41.

3. Kimambo IN. The management of roads in Tanzania: A daunting task 2003.

4. Wu CH, Hsieh TY, Cheng WL, Lu ST. Grey relation analysis of causes for change orders in highway construction. Construct Manag Econ 2004; 22 (5) : 509-20.

5. Burati JL Jr, Farrington JJ, Ledbetter WB, Ledbetter BW. Causes of quality deviations in design and construction. J Constr Eng Manage 1992; 118 (1) : 34-49.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3