Affiliation:
1. Department of Industrial and Manufacturing Systems Engineering The University of Hong Kong Pok Fu Lam Hong Kong China
2. School of Intelligent Systems Science and Engineering Jinan University Zhuhai China
3. Guangdong International Cooperation Base of Science and Technology for GBA Smart Logistics Jinan University Zhuhai China
4. Department of Industrial and Systems Engineering The Hong Kong Polytechnic University Hung Hom Hong Kong China
Abstract
AbstractFit‐out operations in modular construction exhibit unique features, such as limited room space and diversely distributed operations in the building. These features pose significant challenges to planning, scheduling, and execution (PSE) of fit‐out activities due to operational parallelism, distributional diversity, and narrower constrained time window in modular construction. Hence, logistics‐operation and multi‐operations synchronizations in a real‐time manner are crucial for PSE of modular construction fit‐out management. With the support of cutting‐edge information technologies, the real‐time data inside the generated digital twins can simplify online optimization models and convert stochastic factors into deterministic parameters. This paper formulates a novel real‐time data‐driven Out‐of‐Order (OoO) model for synchronized PSE in modular construction fit‐out management. Drawing inspiration from OoO mechanism in Central Processing Unit (CPU), a real‐time data‐driven and rolling‐horizon‐based OoO model is proposed for PSE of modular construction fit‐out, employing a forward heuristic algorithm for solution. Time–space–state data from digital twins are updated to facilitate dynamic decision‐making of managers. Through stochastic computational experiments, we demonstrate the effectiveness of OoO model in optimizing project metrics and the improved resilience in uncertain environments.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献