Abstract
The settlement record of a point on the National Museum building in Ottawa for the period 1951 to 1974 is given. It shows that the average rate of settlement for this period was about 0.003 ft (0.9 mm) per year. Total settlement of the point since the structure was completed in 1910 is estimated to be 0.27 ft (82 mm).
Publisher
Canadian Science Publishing
Subject
Civil and Structural Engineering,Geotechnical Engineering and Engineering Geology
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献