Affiliation:
1. TotalFinaElf Exploration, U.K.
2. Norwegian Computing Centre
Abstract
Summary
A synthetic reservoir model, known as the PUNQ-S3 case, is used to compare various techniques for quantification of uncertainty in future oil production when historical production data is available. Some results for this case have already been presented in an earlier paper.1
In this paper, we present some additional results for this problem, and also argue an interpretation of the results that is somewhat different from that presented in the earlier paper. The additional results are obtained with the following methods: importance sampling, history matching of multiple models using a pilot-point approach, and Markov Chain Monte Carlo (MCMC).
Publisher
Society of Petroleum Engineers (SPE)
Subject
Geotechnical Engineering and Engineering Geology,Energy Engineering and Power Technology
Cited by
56 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献