Abstract Shallow coalbed methane (CBM) projects can have multiple pay zones available for completion. Cased-hole completions allow zonal isolation to direct treatments, but re-establishing a connection to a coalseam through drilling and cementing damage may require high breakdown pressures even with an acid spearhead. Isolating individual zones to help ensure completion effectiveness is paramount to a successful completion. This paper details the use of composite epoxy-glass fracturing plugs to reduce time to complete, drill out, and clean up wells drilled in the Southern Illinois Basin (SIB) project. Over 80 wells have been completed in multiple stages using as many as three composite frac plugs to isolate four coals. Accurate placement of plugs by electric line to allow staging as close as 10 ft was accomplished without communication. These four-stage frac completions were accomplished in less than 8 hours before flowing back frac fluids from all zones. Less than a single day was required to drill out all the plugs, go to bottom, circulate clean, and prepare the wells to begin pumping. The authors compare this technique with the cost and time required to do completions with alternative isolation methods.

Publisher

SPE

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.7亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2025 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3