Delaying Multiphase Pump Gas-Lock in High-GVF Flows Using High-Speed Operation

Author:

Ejim Chidirim1,Xiao Jinjiang1,Lee Woon2,Zabala Wilson2

Affiliation:

1. Saudi Aramco

2. Alkhorayef Petroleum Company

Abstract

AbstractMany pumping systems tend to lose pressure boosting capability at high intake gas volume fractions (GVF) resulting in gas-lock. Delaying occurrence of gas-lock is beneficial to extending the operating envelope of these pumping systems. This study presents the results of operating a multiphase pump at speeds higher than typical, conventional field applications, in addition to incorporating a flow-conditioning device at pump inlet. These attributes delayed occurrence of multiphase gas-lock to intake GVFs up to 98%.The multiphase pump tested had a 5.38-inch housing outer diameter and shaft rotational speed of 6000 revolutions per minute (RPM). A nozzle was installed at the pump inlet to facilitate homogenization. The range of total volume flow rate of air and water at pump intake was between about 4900 to 7600 barrels per day (BPD), with intake pressures approximately 50 psig. The total intake volume flow rates were varied and the pump pressure boost was measured until the pump gas-locked.The results showed that for the total volume flow rates tested, the multiphase pump was able to provide pressure boost of about 55psi at an intake GVF of 91%. For other flow conditions when the intake GVF was increased to 98%, the multiphase pump provided a 10 psi pressure boost. An observation during the test was the gas-liquid mixture flow through a nozzle resulted in a very fine spray mist. With the nozzle installed at the pump intake, a more stable pump operation was achieved throughout the tests. In conclusion, operating the pump at speeds of 6000 RPM facilitated extension of the operating condition when gas-lock occurred in the multiphase pump. Installing a nozzle device was beneficial in conditioning the flow at entry to the pump to ensure stable operating conditions. These findings are being incorporated in a field prototype version of the pump to handle higher volumes of gas and liquid in the field.This study mainly highlights the method used to delay gas-lock in a multiphase pump. Operating the pump at higher than conventional speeds and installing components at the pump inlet to condition the flow are beneficial to ensure the pump continues to deliver pressure boost for intake GVFs up to 98%. Extending multiphase pump operating envelope is desirable for field operators to produce more continuously and economically from wells with very high gas content.

Publisher

SPE

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3