1. Korea Superconducting Tokamak Advanced Research Project: Development of Tokamak Structure and Vacuum System, Report of KBSI, 1998, RP 17-2-1.
2. Manufacturing & high heat flux testing of tungsten brazed mockups in KSTAR;Kim,2015
3. Manufacturing and examination for ITER blanket first wall small-scale mockups with KoHLT-EB in Korea;Kim;IEEE Trans. Plasma Sci.,2014
4. Thermomechanical behavior of actively cooled, brazed divertor components under cyclic high heat flux loads;You;J. Nucl. Mater.,1997
5. ITER, Materials Properties Handbook, 2007.