1. Rules for Construction of Nuclear Power Plant Components, Section III, Division-1, Division-2 and Appendices;ASME Boiler & Pressure Vessel Code,2007
2. Features of 1:4 Size 540 MWe PHWR Pre-Stressed Concrete Containment Test Model at Tarapur and the List of Proposed Experiments – A Report Prepared by the Committee Constituted by Director;BARC,2006
3. Predictions of ultimate load capacity for pre-stressed concrete containment vessel model with BARC finite element code ULCA;Basha;Ann. Nucl. Energy,2003
4. Studies on influence of steel liner and pre-stressing tendons on ultimate load capacity of pre-stressed concrete containment test model;Basha,2003
5. A review of the design and construction of the Sizewell B pressurized water reactor building containment structure;Davies;NED,1995