1. Schedule-based construction incentives;Abu-Hijleh;Journal of Construction Engineering and Management,1989
2. Multi-objective optimization of time-cost-quality using multi-colony ant algorithm;Afshar;Asian Journal of Civil Engineering (Building and Housing),2007
3. Promises, pitfalls and shortfalls of the guaranteed maximum price approach: a comparative case study;Anvuur,2010
4. An agency perspective for the multi-mode project scheduling with time/cost trade-offs;Aouam;Computers and Operations Research,2019
5. Incentive/disincentive contracts: perceptions of owners and contractors;Arditi;Journal of Construction Engineering and Management,1998