Author:
Tserng H. Ping,Yin Y.L.,Jaselskis Edward J.,Hung Wu-Chueh,Lin Yi-Chieh
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference18 articles.
1. Factor of non-excusable delays that influence contractor's performance;Abd.Majid;J. Manage. Eng.,1998
2. Delay mitigation in the Malaysian construction industry;Abdul-Rahman;J. Constr. Eng. Manage.,2006
3. Representing work spaces generically in construction method models;Akinci;J. Constr. Eng. Manage.,2002
4. Assessment of the capabilities of a commercial 4D CAD system to visualize equipment space requirements on construction sites;Akinci,2003
5. Causes of delay in large building construction project in Saudi Arabia;Assaf;J. Manage. Eng.,1995
Cited by
31 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献