1. Modular integrated construction for high-rise buildings;Pan,2018
2. Virtual reality supported lift planning for modular integrated construction of high-rise buildings;Zhang;HKIE Transact.,2019
3. Lift planning and optimization: a thirty-year review;Zhang;Autom. Constr.,2020
4. Particle bee algorithm for tower crane layout with material quantity supply and demand optimization;Lien;Autom. Constr.,2014
5. Optimizing location of tower cranes on construction sites through GIS and BIM integration;Irizarry;J. Informat. Technol. Const.,2012