Author:
Kim Taehoon,Lim Hyunsu,Kim Seung Woo,Cho Hunhee,Kang Kyung-In
Funder
High-Tech Urban Development Program
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference17 articles.
1. An analysis of the optimal planning of material lifting in the high-rise building construction;Park,2001
2. A development of next generation intelligent construction liftcar toolkit for vertical material movement management;Cho;Autom. Constr.,2011
3. Simulation model incorporating genetic algorithms for optimal temporary hoist planning in high-rise building construction;Shin;Autom. Constr.,2011
4. Development of optimum construction lift operation system using sensing information for high-rise building;Shin;Korean J. Constr. Eng. Manag.,2013
5. A vertical movement plan for labors in high-rise building construction using discrete-event simulation;Ahn;Korean J. Constr. Eng. Manag.,2004
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献