1. R5, “Assessment procedure for the high temperature response of structures”, R5 Issue 3, June 2003, EDF Energy. (See also D.W.Dean, P.J.Budden and R.A.Ainsworth, “R5 procedures for assessing the high temperature response of structures: current status and future developments”, In: Proceedings of PVP2007, the 2007 ASME pressure vessels and piping division conference. San Antonio, Texas, USA; July 22–26 2007, paper PVP2007-26569).
2. Bray DP, Dennis RJ and Bradford RAW. Modelling the complex manufacturing history of a pipework joint and assessment of its through-life creep-fatigue damage using finite element based methods”. In: Proceedings of the ASME 2010 pressure vessels & piping division/K-PVP conference, PVP2010. Bellevue, Washington, USA; July 18–22 2010.
3. Handbook of Monte Carlo methods, wiley series in probability and statistics;Kroese,2011
4. Sensitivity analysis of creep crack growth prediction using the statistical distribution of uniaxial data;Yatomi;Fatigue Fract Eng Mater Struct,2010
5. Probabilistic analysis of creep crack initiation and growth in pipe components;Nikbin;Int J Press Vess Piping,2003