1. Using last planner indicators to identify early signs of project performance;Alarcón,2014
2. Benchmarking project-driven production in construction using productivity function: capacity and cycle time;Antunes;J. Constr. Eng. Manag.,2018
3. Applying lean thinking in construction and performance improvement;Aziz;Alexandria Eng. J.,2013
4. Positive vs. Negative iteration in design;Ballard,2000
5. The Last Planner System of Production Control;Ballard,2000