Author:
Wang Zhaojing,Hu Hao,Gong Jie,Ma Xiaoping,Xiong Wuyue
Funder
Beijing Jiaotong University
Subject
Industrial and Manufacturing Engineering,Strategy and Management,General Environmental Science,Renewable Energy, Sustainability and the Environment
Reference87 articles.
1. Integrated collaborative tools for precast supply chain management;Abedi;Sci. Iran.,2016
2. Utilizing Radio Frequency Identification on Precast Concrete Components-Supplier's Perspective;Akinci,2003
3. A multi-objective GA-based optimisation for holistic manufacturing, transportation and assembly of precast construction;Anvari;Autom. ConStruct.,2016
4. Off-site construction optimization: sequencing multiple job classes with time constraints;Arashpour;Autom. ConStruct.,2016
5. A heuristic algorithm for the n job, m machine sequencing problem;Campbell;Manag. Sci.,1970
Cited by
114 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献