1. Construction contract claims, changes and dispute resolution;Levin,1998
2. Delay analysis – eliminating the smoke and mirrors;Fruchtman;Trans AACE Int,2000
3. Construction scheduling preparation, liability, and claims;Wickwire,1991
4. But-for schedules – analysis and defense;Zack;Cost Eng AACE,2001
5. SCL – Society of Construction Law. Delay and disruption protocol; 2002. Available from: www.eotprotocol.com.