Author:
Lee Young Hae,Jeong Chan Seok,Moon Chiung
Subject
General Engineering,General Computer Science
Reference18 articles.
1. Common due date assignment for scheduling on a single machine with jointly reducible processing times;Biskup;International Journal of Production Economy,2001
2. A heuristic bicriterion approach to integrated process plan selection and job shop scheduling;Brandimarte;International Journal of Production Research,1995
3. Minimizing makespan in a blocking flowshop using genetic algorithms;Caraffa;International Journal Production Economy,2001
4. Chung, D., Lee, K., Shin, K., Park, J. (2000). An algorithm for job shop scheduling problem with due date constraints considering operation subcontract. Proceedings of the 15th ICPR International Conference.
5. A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs;Dellaert;International Journal of Production Economy,2000
Cited by
152 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献