1. Cost Reduction of Diaphragm Wall Excavation Using Air Form and Case Record, 15th ICEG Environmental Geotechnics;Akagi,2006
2. Chaney, R. C., K. R. Demars, S. Lee, and I. Lee, Retaining Wall Model Test with Waste Foundry Sand Mixture Backfill, Geotechnical Testing Journal 24, no. 4(2001), pp.401–408.
3. Garbin, E., Hussin, J., Kami, C., 2010. Earth Retention Using the TRD Method, Earth Retention Conference (ER), Bellevue, Washington, pp. 318–325.
4. First Use of TRD Construction Technique for Soil Mix Cutoff Wall Construction in the United States;Gularte,2007
5. Hassanien, I. A., Salama, A.A., Hosham, H. A., 2011. Analytical and Numerical Solutions of Generalized Burgers Equation Via Buckingham's Pi-theorem. Can. J. Phys. 83, 10 (2011), 1035–1049.