Author:
Asadujjaman Md.,Rahman Humyun Fuad,Chakrabortty Ripon K.,Ryan Michael J.
Reference18 articles.
1. A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning;Aquilano;Journal of Operations Management,1980
2. Asadujjaman, M., Rahman, H.F., Chakrabortty, R.K., Ryan, M.J., 2020. An immune genetic algorithm for resource constrained project scheduling problem with discounted cash flows, in: 2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), IEEE. pp. 1179–1183.
3. An immune genetic algorithm for solving npv-based resource constrained project scheduling problem;Asadujjaman;IEEE Access,2021
4. An immunity-based hybrid genetic algorithms for permutation flowshop scheduling problems;Bessedik;The International Journal of Advanced Manufacturing Technology,2016
5. Coordinating supplier selection and project scheduling in resource-constrained construction supply chains;Chen;International Journal of Production Research,2018
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献