Funder
National Natural Science Foundation of China
Ministry of Education of the People's Republic of China
China Postdoctoral Science Foundation
Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research,Economics and Econometrics,General Business, Management and Accounting
Reference39 articles.
1. Construction bidding and the Winner's curse: game theory approach;Ahmed;Journal of Construction Engineering and Management,2016
2. Confidence intervals to bound the value of time;Armstrong;Transport. Res. E Logist. Transport. Rev.,2001
3. Duration prediction models for construction projects: in terms of cost or physical characteristics?;Bayram;KSCE J. Civ. Eng.,2017
4. Explaining cost overruns of large-scale transportation infrastructure projects using a signaling game;Cantarelli;Transportmetrica: Transport Science,2013
5. Auctioning supply contracts;Chen;Manag. Sci.,2007
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献