1. H. Shan, S. Li, D. Gong, and P. Lou, “Genetic simulated annealing algorithm-based assembly sequence planning,” in Technology and Innovation Conference, 2006. ITIC 2006. International, 2006, pp. 1573-1579.
2. Z. Yin, H. Ding, H. Li, and Y. Xiong, “A connector-based hierarchical approach to assembly sequence planning for mechanical assemblies,” Computer-Aided Design, vol. 35, pp. 37-56, 2003.
3. B. Zeng, M.-f. LI, and Y. Zhang, “Assembly sequence planning based on improved firefly algorithm,” Computer Integrated Manufacturing Systems, vol. 4, p. 011, 2014.
4. H. Lv and C. Lu, “An assembly sequence planning approach with a discrete particle swarm optimization algorithm,” The international journal of advanced manufacturing technology, vol. 50, pp. 761-770, 2010.
5. L. Dong-Ru, “Application of the API of CAD System to the Establishment of Product Structure Data Model and the Automatic Analysis of Assembly and Disassembly” 2008.