Author:
Aminbakhsh Saman,Sonmez Rifat
Subject
Artificial Intelligence,Computer Science Applications,General Engineering
Reference40 articles.
1. Using electimize to solve the time-cost-tradeoff problem in construction engineering;Abdel-Raheem,2011
2. Nondominated archiving multicolony ant algorithm in time–cost trade-off optimization;Afshar;Journal of Construction Engineering and Management,2009
3. Network decomposition-based benchmark results for the discrete time–cost tradeoff problem;Akkan;European Journal of Operational Research,2005
4. Hybrid particle swarm optimization algorithm for obtaining Pareto front of discrete time–cost trade-off problem [M.Sc. Thesis];Aminbakhsh,2013
5. Shuffled frog-leaping model for solving time-cost-resource optimization problems in construction project planning;Ashuri;Journal of Computing in Civil Engineering,2015
Cited by
90 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献