1. DYWIDAG multistrand stay cable systems, 2017. DYWIDAG-SYSTEMS International, 04 178-1/07.17 -web sc, dywidag-systems.com/emea.
2. BBR HiAm CONA. Strand stay cable system. BBR VT International, 03.2009, www.bbrnetwork.com.
3. prEN 10138-2, 2009. Prestressing Steels–Part 2:Wires CEN.
4. FIB bulletin 30, Acceptance of stay cable systems using prestressing steels, FIB 2005, ISSN 1562-3610.
5. Analysis of the environmental degradation effects on the cables of La Arena bridge (Spain);Álvarez;Procedia Struct. Integrity,2017