1. The Connection of peak alarm rates to plant incidents and what you can do to minimize;Beebe;Process Saf. Prog.,2013
2. Bond Graph Methodology;Borutzky,2010
3. Alarm analysis with fuzzy logic and multilevel fow models;Dahlstrand;Proc. 18th Annu. Int. Conf. Br. Comput. Soc. Spec. Gr. Expert Syst,1998
4. Consequence analysis theory for alarm analysis;Dahlstrand;Knowledge-Based Syst.,2002
5. Fang, M. (1994). MFM Modelling Method and Application. Technical Report 94-D-713, Technical Univeristy of Denmark, Lyngby, Denmark.