Author:
Hannan Qureshi Abdul,Salah Alaloul Wesam,Kai Wing Wong,Saad Syed,Ali Musarat Muhammad,Ammad Syed,Farouk Kineber Ahmed
Reference67 articles.
1. Project Risk Factors Facing Construction Management Firms;Park;Int J Civ Eng,2019
2. M. Kopsida, I. Brilakis, P. Vela, A Review of Automated Construction Progress and Inspection Methods, in: Proc. 32nd CIB W78 Conf. Constr. IT, 2015: pp. 421–431.
3. Improving transparency in construction management: a visual planning and control model;Brady;Eng Constr Archit Manag,2018
4. A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects;Mejlænder-Larsen;Eng Constr Archit Manag,2019
5. Case study of “project controlling” on a large HOPSCA project in China;Wang;Eng Constr Archit Manag,2017
Cited by
16 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献