1. Maher TK. Rapid replacement of bridge decks. Final report, 12–41, National Cooperative Highway Research Program, Transportation Research Board, July 1997.
2. Analysis of full depth precast concrete bridge deck panels;Issa;PCI J,1998
3. Experimental behavior of full-depth precast concrete panels for bridge rehabilitation;Issa;ACI Struct J,2000
4. Issa MA, Anderson R, Domagalski T, Khayyat S. Design considerations of full depth precast/prestressed concrete bridge deck panels. In: Proceedings of the 1st annual concrete bridge conference sponsored by FHWA and NCBC, and organized by PCI, October 2002. 20p.
5. Full depth precast and precast, prestressed concrete bridge deck panels;Issa;PCI J,1995