Effect of Early Opening to Traffic on Fatigue Damage to Concrete Pavement

Author:

Freeseman Katelyn1,Hoegh Kyle2,Izevbekhai Bernard Igbafen3,Khazanovich Lev4

Affiliation:

1. Room 179, Civil Engineering Building, Department of Civil, Environmental, and Geo-Engineering, University of Minnesota, 500 Pillsbury Drive, SE, Minneapolis, MN 55455

2. Room 110C, Civil Engineering Building, Department of Civil, Environmental, and Geo-Engineering, University of Minnesota, 500 Pillsbury Drive, SE, Minneapolis, MN 55455

3. Minnesota Department of Transportation, Office of Materials and Road Research, 1400 Gervais Avenue, Maplewood, MN 55109

4. Room 160, Civil Engineering Building, Department of Civil, Environmental, and Geo-Engineering, University of Minnesota, 500 Pillsbury Drive, SE, Minneapolis, MN 55455

Abstract

The current methods for determining criteria for opening a roadway to traffic are often overly conservative, causing unnecessary construction delays and user costs. This problem can be explained, in part, by the purely empirical nature of the current methods. These criteria require wait periods after concrete placement or certain levels of compressive or flexural strength, or both, after concrete placement, and specific site conditions are not accounted for. Further, the effect of early traffic-related loads on long-term pavement behavior has not been quantified. In this study, the effect of early opening on pavement damage was reexamined through a laboratory study and analytical modeling. The result was a mechanistic-based procedure for evaluating the effect of early opening to traffic on the accumulation long-term damage; this procedure also accounts for critical factors such as climate, traffic level, and pavement design characteristics. The basis of this method is a modification of the fatigue damage analysis in the Mechanistic–Empirical Pavement Design Guide; this modification enables an analysis of traffic loading on the first 28 days of pavement life. The procedure also enables an update to predictions on the basis of as-built nondestructive testing measurements of the pavement. The output of the analysis is a quantitative damage prediction that allows the road owner to do a cost–benefit analysis of the timing for opening the road on the basis of the specific site and traffic characteristics. The results presented here show how innovated opening criteria based on load restrictions can allow for early opening while mitigating any adverse effect on the long-term pavement performance.

Publisher

SAGE Publications

Subject

Mechanical Engineering,Civil and Structural Engineering

Reference10 articles.

1. RoeslerJ., HarveyJ. H., FarverJ., and LongF., Investigation of Design and Construction Issues for Long Life Concrete Pavement Strategies. FHWA/CA/OR-2000/04. Pavement Research Center, Institute of Transportation Studies, University of California, Berkeley, 2000.

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3