1. Fasullo, E. J., and Hahn, D. M., George Washington Bridge Redecked with Pre-fabricated Panels and No Traffic Delay, Civil Engineering, December 1977.
2. Forsyth, B., and Stahl, F. L., Throgs Neck Bridge: Why Did Its peck Deteriorate? Civil Engineering, July 1983.