Affiliation:
1. Software Engineering College, Zhengzhou University of Light Industry, Zhengzhou, China
2. School of Computer and Communication Engineering, Zhengzhou University of Light Industry, Zhengzhou, China
Abstract
Production scheduling problems have historically emphasized cycle time without involving the environmental factors. In the study, a low-carbon scheduling problem in a flexible job shop is considered to minimize the energy consumption, which mainly consists of two parts: the useful part and the wasted part. First, a mathematical model is built based on the features of the workshop. Second, a modified migrating bird's optimization (MMBO) is developed to obtain the optimal solution. In the MMBO, a population initialization scheme is designed to enhance the solution quality and convergence speed. Five types of neighborhood structures are introduced to create neighborhood solutions. Furthermore, a local search method and a reset mechanism are developed to improve the computational results. Finally, experimental results validate that the MMBO is effective and feasible.
Subject
Computer Networks and Communications
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献