Revisiting Causative Factors of Project Cost Overrun in Building Construction Projects in Nigeria

Author:

Akinradewo O,Aigbavboa C,Akinradewo O

Abstract

Abstract The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost. The total cost of construction in normal circumstances is expected to be the sum of materials, labour, site overheads, eEquipment/plant, head office cost and profit but in many parts of the world particularly in Nigeria, there are other costs to be allowed for. To the end user, the added costs are passed on as higher rental/lease costs or prices. The aim of this study is to appraise the causative factors of cost overrun on building construction project in the Nigerian construction industry. This study was carried out using quantitative research method. This involved the collection of data relating to the research study through questionnaires prepared using literature search and carried out among professionals in the construction industry such as Architects, Builders, Engineers, Project Managers and Quantity Surveyors. Random sampling technique was employed in selecting the 156 respondents for the research study within the South Western region of Nigeria. Data retrieved were analysed using Percentile, Mean item Score and Kruskal-Wallis H-test. Findings revealed that additional cost (e.g. variations), poor financial control on site, contract management, previous experience of contractor, wrong estimation method are the major factors leading to cost overrun on building construction projects. The study concluded that construction projects experience cost overrun as a result of negligence in one way or the other by all the stakeholders involved in the construction process from inception to final completion.

Publisher

IOP Publishing

Subject

General Medicine

Reference21 articles.

1. Causes and effects of delays in Malaysian construction industry;Sambasivan;Int. J. Proj. Manag.,2007

2. Investigation of the causes of delay and cost overrun in construction projects in Uganda’s public sector;Apolot,2011

3. Reducing building construction costs; the views of consultants and contractors;Mbachu,2004

4. Construction cost estimation: A parametric approach for better estimates of expected cost and variation;Swei;Transp. Res. Part B Methodol.,2017

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3