Author:
Akinradewo O,Ngwenya L,Aigbavboa C,Thwala W,Mphela L
Abstract
Abstract
The use of cost contingency in construction projects provides a lucid and lively recognition of upcoming/impending challenges of cost overrun in delivering the construction project thereby giving room for project delivery to cost. The aim of this study is to evaluate how the efficacy of cost contingency plans for construction projects can be improved. This study adopted the use of a quantitative research approach with the use of questionnaire structured to capture the perceived measures of improving the efficacy of cost contingency plans for construction projects. The study harnessed information from Construction Managers/Project Managers, Contract Managers and Quantity Surveyors in Gauteng Province, South Africa. Data retrieved was analysed using mean item score, standard deviation and Kruskal-Wallis H-test. This study was limited to Gauteng province in South Africa due to time and cost constraint. The findings showed that the three most effective measures of the efficacy of cost contingencies in construction projects are assessing risk possibilities, assessing risk impact, and identifying project risk and uncertainties. The study concluded that cost contingency plan can be improved when risks are adequately assessed together with their impact on the construction project. By recommendation, identification; definition; and evaluation of risks is a paramount activity which project professionals must embark upon before a construction project can commence.
Reference19 articles.
1. What Is Cost Planning in the Construction World?;Johnson,2018
2. 11 Contingency-Planning Tips;Fry,2013
3. Contingency estimation using a real options approach;Tseng;Constr. Manag. Econ.,2009
4. 4 Types of Cost Contingency;Spacey,2017
5. Project Variables Influencing Contingency on Construction Contract in Nigeria;Bello,2009
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献