Author:
Dahlan M A,Pratama H B,Saptadji N M
Abstract
Abstract
The development of geothermal fields needs 5-6 years from the first well drilled until the operation of the central power plant. Between the gap years, the wells will be shut in and will be re-opened when the power plant is ready. However, there is an alternative to utilize the wells with Wellhead Generating Unit (WGU), the small power plant which can generate the electricity as soon as the drilled productive wells completed. Then, the objective of this study is to decide the preferable scheme for the installed capacity of WGU with economic consideration. Correspondingly, this study uses two full factorial experimental design with Monte Carlo simulation to calculate and design the condensing turbine. Steam fraction, mass flow rate, turbine inlet pressure, and turbine exhaust pressure are the parameters to be analyzed in the Monte Carlo Simulation. The economic feasibility of the project is based on capital expenditure, decline curve analysis, and electricity price. The result of probability, P10, P50, and P90 of gross power output and Specific Steam Consumption (SSC) are 6.1, 7.9, 9.9 MWe and 1.85, 1.89, 1.93 kg/s/MWe respectively. Based on the economic evaluation, the P10, P50, and P90 of Internal Rate of Return (IRR) and Net Present Value (NPV) are 12%, 16%, 21% and 1.1 MUSD, 3.6 MUSD, 6.0 MUSD respectively over 30 years of WGU lifetime. This paper is the first study for designing the WGU combined with an economic study based on the technical evaluation to propose the best option to develop the field.
Reference31 articles.
1. Wellhead generating plants: KenGen experience;Saitet,2015
2. The use of portable geothermal wellhead generators as small power plants to accelerate geothermal development and power generation in Kenya;Sutter,2012
3. Probabilistic approach: back pressure turbine for geothermal vapor-dominated system;Ahmad;IOP Conf. Ser. Earth Environ. Sci.,2017
4. Optimal experimental design for finding optimally located boreholes in geothermal engineering;Seidler,2015
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献