Pre-feasibility Study of Condensing Wellhead Generating Unit Utilization in Partially Vapor Dominated System

Author:

Dahlan M A,Pratama H B,Saptadji N M

Abstract

Abstract The development of geothermal fields needs 5-6 years from the first well drilled until the operation of the central power plant. Between the gap years, the wells will be shut in and will be re-opened when the power plant is ready. However, there is an alternative to utilize the wells with Wellhead Generating Unit (WGU), the small power plant which can generate the electricity as soon as the drilled productive wells completed. Then, the objective of this study is to decide the preferable scheme for the installed capacity of WGU with economic consideration. Correspondingly, this study uses two full factorial experimental design with Monte Carlo simulation to calculate and design the condensing turbine. Steam fraction, mass flow rate, turbine inlet pressure, and turbine exhaust pressure are the parameters to be analyzed in the Monte Carlo Simulation. The economic feasibility of the project is based on capital expenditure, decline curve analysis, and electricity price. The result of probability, P10, P50, and P90 of gross power output and Specific Steam Consumption (SSC) are 6.1, 7.9, 9.9 MWe and 1.85, 1.89, 1.93 kg/s/MWe respectively. Based on the economic evaluation, the P10, P50, and P90 of Internal Rate of Return (IRR) and Net Present Value (NPV) are 12%, 16%, 21% and 1.1 MUSD, 3.6 MUSD, 6.0 MUSD respectively over 30 years of WGU lifetime. This paper is the first study for designing the WGU combined with an economic study based on the technical evaluation to propose the best option to develop the field.

Publisher

IOP Publishing

Subject

General Engineering

Reference31 articles.

1. Wellhead generating plants: KenGen experience;Saitet,2015

2. The use of portable geothermal wellhead generators as small power plants to accelerate geothermal development and power generation in Kenya;Sutter,2012

3. Probabilistic approach: back pressure turbine for geothermal vapor-dominated system;Ahmad;IOP Conf. Ser. Earth Environ. Sci.,2017

4. Optimal experimental design for finding optimally located boreholes in geothermal engineering;Seidler,2015

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3