Author:
Yang Hu,Rao Jianbo,Zhu Chenghua
Abstract
Abstract
As the Arctic’s strategic position has become increasingly prominent, China’s existing icebreaker fleet has been unable to meet the growing demand for polar affairs such as polar scientific research, Arctic shipping, and polar emergency. From the perspective of route planning, the marine environmental conditions faced by nuclear-powered icebreakers have been sorted out. The research status of domestic nuclear power plant, the selection and design of nuclear power propulsion plant and the main technical requirements were put forward. Finally, the overall plan design was carried out from the aspects of general layout, main dimensions, shaft power, etc., and the main technical requirements for hull design were put forward.
Reference12 articles.
1. Analysis of design characteristics of Russian icebreaker[J];Yinghao;Polar Research,2017
2. Analysis of my country’s polar shipping capacity building and high ice-class fleet development countermeasures[J];Jianmin;Polar Research,2018
3. The strategic significance of the Arctic and the development of oil and gas resources[J];Shuling;China Mining Industry,2018
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献